Your tile looks fine and the roof still leaks. The part that failed is under the tile, and replacing it is one job with four names. Here's what it is, what comes off, what goes on, and what to ask before you sign.
Tile roof underlayment replacement. Tile lift and relay. Tile reset. Tile re-set. They're the same job. Different companies use different words for it, and that trips people up when they're searching. Roofers mostly say lift and relay, because that's what happens: your tile gets lifted, the underlayment under it gets replaced, and your own tile gets relaid. What's included when we do it is on our tile lift and relay page.
Yes. That's the whole job. The tile is the armor. The underlayment under it is the waterproofing. Concrete tile can go 50 years or more. The felt under most of the tile roofs we open in the Inland Empire is done at 20 to 30. So the tile outlives what's under it, and every tile home is going to need at least one underlayment job in its life.
When the tile is still sound, you keep it. Your tile comes up, the old felt comes off, new underlayment goes down, and your own tile goes back on. Same look from the street, a completely different roof underneath, and no new tile to buy.
Riverside, CA: the tile comes up and gets stacked on the roof. What's left between the stacks is the old underlayment.
The honest counterpart: if your tile is cracked, chipped or discontinued so it can't be matched, this is not the right job, and I'll tell you so. That's a tile replacement with new tile, and it costs more. I quote the cheaper job when it's the right one.
Three things I look for. Any one of them is enough to have the conversation.
When I lift a tile on an old roof and the felt crumbles in my hand, there's no repair that fixes that. If you're not sure which job your roof needs, repair, lift and relay, new tile or shingle walks through all four.
Loma Linda, CA: new Titanium PSU30 down over the whole roof, the homeowner's own tile stacked and waiting to go back.
That job, start to finish, is in our Loma Linda lift and relay post.
Under tile we install self-adhered, peel and stick membranes: Owens Corning Titanium PSU30, Westlake Royal TileSeal HT and Spyder PSU. Each has a rubberized asphalt layer that seals itself around the nails. The numbers in the names are product names, not lifespans.
The warranties are not the same. PSU30 carries Owens Corning's limited lifetime warranty on a single-family detached home the owner lives in, for as long as that owner owns it, and 40 years on any other home or building. TileSeal HT carries a 30 year material warranty. Spyder PSU carries a 20 year limited warranty. What those papers cover, and what they don't, is in underlayment warranties: read the paper, not the roll. Whichever one your roof gets is written on your contract by name.
Yes. A facet is one plane of the roof, between a ridge and an edge or a valley. If the back of the roof is failing and the front is fine, we can lift and relay just that plane. We recommend the full facet, we'll do a spot repair when that's what the roof calls for, and we tell you straight which one it is. How I decide is in spot repair or the full facet.
Most lift and relays run three to seven days, depending on the size and pitch of the roof. It's loud for those days, and your driveway has tile stacks and a truck in it. Then it's over, and the roof under your tile is new.
In every city we work, a lift and relay over the repair threshold is a reroof permit. We pull it, the city inspects, and the record is yours. How the whole job runs, from the first day to the final inspection, is in our roof replacement timeline.
I'm not going to put a number in a blog post. The real number comes from walking your roof, and it comes in writing. What I can tell you is why it costs less than new tile: you're not buying tile. You're paying for labor and underlayment. If you want a ballpark before you call, our roofing calculator gives you one for a tile lift and relay based on your roof size.
If the tile is still good, keep it. Replace what's under it.
Whoever quotes your roof, ask four things.
Before signing a tile replacement contract, a Rancho Cucamonga, CA homeowner sent me five of the sharpest questions I got all year. My answers are inmost roofers hate getting grilled. I published my answers.
Free in-home estimate, in writing. If a repair is all your roof needs, I'll tell you that. We do asphalt shingle roofs, tile replacement with new tile, tile lift and relay, and flat roofs across the Inland Empire.
(909) 819-8394