A lot of people go looking for a roofing and solar company because they have panels on a roof that needs work, or they are about to go solar on a roof that is getting old. Here is how the two jobs fit together, and what matters more than how many companies are on the job.
You need a good roofer for the roof and a licensed contractor for the panels. That can be one company or two. What decides whether the job goes well is the order the work happens in, and who is on the hook for each part, in writing.
We are a roofing contractor, C39 licensed. We don't sell or design solar systems. When panels have to come off so we can replace a roof or fix a leak under the array, it goes one of two ways. We arrange it with a licensed C-10 electrical contractor, or your solar company handles it directly. Both work. Which one makes sense depends on who owns the panels and what your solar warranty says.
Taking panels off means disconnecting them from your electrical system. Putting them back means reconnecting it. That is electrical work, not roofing. In California it goes to a licensed solar contractor (C-46) or electrical contractor (C-10), and some cities spell that out right on their paperwork for a solar removal and reinstall. A roofing crew unplugging your array to save a phone call is not a shortcut you want.
If you own the system outright and the warranty allows it, we line up the C-10 for you and keep both crews on one schedule.
This is the part people skip, and it is the part that matters the day something leaks. Our workmanship warranty, 10 years on a replacement, covers the roof we install. The panel removal and reinstall, the mounts, and the holes they put in the roof belong to whoever did that work. Get it in writing before the job starts.
On a recent job where the homeowner's solar company handled the panels, we wrote it right into the agreement: the solar company removing and reinstalling the panels does not void our workmanship warranty, and leaks caused by their mounts or roof penetrations are on their work, not ours. Clear lines like that are what keep two companies from pointing at each other later.
If your roof has fewer than 10 good years left, do the roof first. Panels last a long time, and paying to take them off and put them back in five years is money you didn't have to spend. The longer version is in Roof First, Then Solar. Always., and what to watch for under the array is in Solar Panels and Your Roof.
The roof under the panels is the hardest part of the house to get back to. Get it right while the panels are off.
Free in-home estimate, in writing. We do the roof and coordinate the panels with a licensed C-10 or your solar company. Asphalt shingle roofs, tile replacement with new tile, tile lift and relay, and flat roofs across the Inland Empire.
(909) 819-8394